Can your sewerage treatment plant handle the extra load?

Yes. The preliminary assessment of daily wastewater generation including the ecotourism addition has been estimated as 23.7 kL/d. The capacity of the existing wastewater treatment plant is 18.1 kL/d. A proposed upgrade to the wastewater treatment plant with a capacity of 30kL/d has been prepared. This is able to be accommodated within the footprint of the approved plant. The treated effluent irrigation system has a current capacity of approximately 50 kL/d which is sufficient to accommodate the increased flow.